Renovations & extensions
Renovations & extensions
- 1948–1950: Construction of the church according to plans by architect Karl Lebwohl; Blessing on May 21, 1950.
- 1952: Elevation to parish church on January 1, 1952 under the first pastor Franz Derler.
- 1957: Church consecration on October 27, 1957.
- 1987–1988: Fundamental redesign by Friedensreich Hundertwasser with architect Manfred Fuchsbichler; Re-consecration on September 4, 1988 by Bishop Johann Weber, under Pastor Friedrich Zeck.
- 2016: Restoration: Re-gilding of the eight balls and the tower bulb (June–October 2016) under Pastor Winfried Lembacher.
- 1952: Elevation to parish church on January 1, 1952 under the first pastor Franz Derler.
- 1957: Church consecration on October 27, 1957.
- 1987–1988: Fundamental redesign by Friedensreich Hundertwasser with architect Manfred Fuchsbichler; Re-consecration on September 4, 1988 by Bishop Johann Weber, under Pastor Friedrich Zeck.
- 2016: Restoration: Re-gilding of the eight balls and the tower bulb (June–October 2016) under Pastor Winfried Lembacher.